• Laser Measurement and Frame Installation: A precise template was created using a laser level to ensure perfect flatness across all points of the ceiling. A robust frame system was installed using galvanized C and U profiles resistant to corrosion, based on a static calculation.
  • Double-Layer Gypsum Board Application: To prevent cracks that may form in the future, especially at the joints, a double-layer gypsum board installation was carried out with calculated flexibility allowance.
  • Hidden Lighting and LED Pool Design: In line with our customer's request, 15 cm deep hidden light channels (light boxes) were created to illuminate the room homogeneously without straining the eyes.
  • Smooth Plaster Finishing: After applying mesh joint tape to the drywall joints, three coats of satin plaster were applied to achieve a "glass-like" smooth surface prior to painting.
  • Lighting Integration: LED strips and spotlights were tested and placed in millimeter-precise gaps without compromising the aesthetic integrity of the ceiling.